
Add to Cart
Used Mop Yarn Brush Twisting Machine Filament Monofilament Yarn Double Twisting Machine
Descripition:
The machine can twist different size of PP, PE, Polyester, Nylon, Cotton single strand or multi-strands twisted yarn, which is widely used in various fields, such as rope, net, twine, webbing, curtain fabrics, etc. The PLC control system makes it adjust technology, direction of twist, speed and molding shape easily. The machine has the characteristics of economic applicability.
* Easy to operate and maintain
* High efficiency and output
* Low noise and power consumption
Technical Parameters:
Mould code | UW100 | UW140 | UW160 | UW200 | UW250 | UW250-A | UW280 | UW-T250 | |
Spindle Number | 184 | 144 | 100 | 72 | 15 | 42 | 40 | 12 | |
Spindle Distance | 140mm | 180mm | 200mm | 280mm | 340mm | 340mm | 380mm | 380mm | |
Ring Diameter | Φ100×16.8mm | Φ140×25.4mm | Φ165×25.4mm | Φ204×38.1mm | Φ254×38.1mm | Φ254×38.1mm | Φ280×38.1mm | Φ254×38.1mm | |
Spindle Speed | 3000-5000r/min | 2000-3000r/min | 1800-2300r/min | 1800-2100r/min | 1800-2300r/min | 2000-4000r/min | |||
Twist Direction | S/Z | ||||||||
Up-down Length | 200or 300mm | 200or 300mm | 300mm | 300mm | 300mm | 300mm | 400mm | 550mm | |
Twist Range | 76~862t/m | 55~619t/m | 55~619t/m | 35~403t/m | 32~270t/m | 35~403t/m | 35~403t/m | 20~600t/m | |
Operating Method | Double side | Double side | Double side | Double side | Single side | Double side | Double side | Single side | |
Motor Power | 15KW | 18.5KW | 18.5KW | 22KW | 7.5KW | 22KW | 22KW | 15KW | |
Overall size | 14.8×1.2×2m | 14.96×1.2×2m | 11.82×1.2×2m | 11.97×1.3×2.1m | 7.63×1.1×2.1m | 9.06×1.4×2.1m | 9.61×1.75×2.3 m | 5.8×1.6×2.3 m | |
yarn count | Ne 21/2~18 | Ne 21/3~38 | Ne 21/5~45 | Ne 21/8~150 | Ne 21/8~170 | ||||
Fibre Denier | 250D~2000D | 1500D~5000D | 1500D~6000D | 600D-13000D | 650D~15000D | ||||
PE | 36tex 3~10 | 36tex 3~25 | 36tex 10~40 | 36tex 20~90 | 36tex 30~110 |
Picture
FAQ:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
5.How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.